In the critical path of evolution

An engineer asked me during a reorg where we fit in the org. The search for a real answer reframed how I think about them.

August 23, 2026

Reorganizations are inevitable and they create anxiety. That much is a natural reaction. But it doesn't mean you're just there for the ride, because there are real things you can do to lower it. When the shape of things changes, everyone spends a while working out what it means for them, and not much else gets their full attention. I've felt it myself. I've watched engineers I think the world of feel it.

I've been through reorganizations at more than one company, and on both sides of that conversation, because I've also been the one planning them and walking into the room knowing exactly how it's going to land.

What's different for a foundational team is its position. When you're placing a team that everything depends on, there's no neutral spot on the chart, because wherever you put it changes what it can optimize for. Correct placement is deliberate, and it has a direct impact on outcome. Seeing that changed how I lead through it.

If you've run one of these teams you know the shape of it. Identity, access, the shared plumbing every product depends on. You're in the critical path of everything, and being there is an advantage if you play it right. From SSO to the login box, you own the surfaces where security and experience meet, and they'll notice the one time you get it wrong.

That's the job, and it's a good one. It also means you're in the critical path of the company's own evolution, which is why a team like this gets repositioned when the ground shifts.

An engineer asked me in a 1:1: "I'd like to know where we fit in the org."

It's a fair question. He wasn't complaining. He wanted to know where we sat and what that meant for his own position. And I wanted to give him a real answer, so I went looking for one.

The chart follows the world

The moving isn't confusion about where we belong. It's the organization responding to a world that won't sit still.

Think about what's shifted underneath identity work in just the last few years. Joiner, mover, leaver stopped being an IT ticket queue and became a security control. The threat landscape moved on from credential stuffing to the much harder question of trust, and AI has made that question harder still. Passwordless went from a roadmap item to an expectation. And now a meaningful share of the principals hitting your systems aren't people at all, they're agents, and nobody's access model was designed for that.

Every one of those shifts makes a different part of the company the most important place for this work to sit.

When risk and regulation are pressing, the answer is close to Security. When customer experience is pressing, it's close to product, because the login experience is one of the most product-facing surfaces a company has. When scale is pressing, it's close to infrastructure. And when AI arrives, get close to the AI group, because whatever they build will need identities before anyone thinks to ask for them. AI groups all over the world are working on these exact problems right now.

I've sat in security, in infrastructure and in product. Infrastructure and product are the two worth putting side by side, because they pulled hardest in opposite directions.

Infrastructure is where the team evolves into a platform.

It also changed what we built. Standing up the IdP. Building an identity management service from scratch.

Product is where we could invest in who we were building for. The feedback loop got short. Questions about friction and trust and what somebody actually experiences at a login screen stopped being abstract, because the people asking them sat nearby.

It also moved us upstream. A decision used to arrive already made, and our job was to deal with it. Close to product we were part of the conversation while it was still a question, which meant we could say what an SSO solution actually requires before anything got promised.

I'd take either again. Neither was a mistake, because which one is right depends entirely on what the company needs to be good at that moment. And when that changes, the shape should change with it.

I can say that because I've been the one drawing the boxes. As a director of engineering I built the reorganization from the ground up for a group of more than fifty engineers across the US, India and Ukraine, and I hired the Ukraine team myself, starting from the first engineer.

The things I was watching all moved. A group with no release cadence at all got a release train, shipping every four weeks because four weeks was what the org could actually hold. Standups went from forty minutes for everyone to fifteen minutes per team, with a parking lot for the rest. Product review stopped being a major rewrite every cycle and became a demo and a few small adjustments, once we broke the PRDs down into initiatives. That restructure is also where I stood up a dedicated QA group.

When you're on that side, you're not looking for somewhere to file an inconvenient team. You're looking at what the business has to get right in the next eighteen months and asking which structure gives it the best chance. The teams everything depends on are the hardest part of that puzzle, and they're the part you think about longest.

Which brings me to the part I had to reframe.

An organization that never adapts its structure isn't stable, it's either not listening or incapable of change.

Noticing the ground has moved and acting on it is a real strength, and rarer than it should be. It just doesn't feel like a strength when you're the team being moved.

Structure shapes what gets built. That part everyone knows. What gets less attention is where the team sits inside it. When a team sits at the edge, moving it changes its own reporting line and not much else. When a team sits in the middle, where everything routes through it, moving it changes the relationship between that team and everyone who depends on it. Same reorganization. Very different question to get right.

What that actually means

So here's what I told him.

Being moved isn't a verdict on your worth. It's a consequence of how much depends on you. If the company is adjusting to something, and everything routes through your team, then your position is part of that adjustment. You can't adapt around a team like ours without adapting us too.

Believing that changes what you do next. Read it the other way and you spend the next quarter proving yourself. Once you understand it's structural, you spend that quarter on something far more useful.

Here's what that looks like in practice.

Not missing a stride

The first job after any reorganization is continuity. The pages still get answered, the roadmap still moves. After that, what I care about most is how fast the team and its new leadership start operating as one unit. Most of that work is mine.

A reorganization resets some of the context and credibility you've built, and the pull is to perform. To over-explain. To walk in and establish that you're one of the good ones.

That instinct is human, and emotional. What's useful to a leader taking on a lot at once isn't a highlight reel. It's whatever shortens the distance between them and a good decision. More is arriving than anyone can process in those first weeks, and whoever reduces that load is who they end up relying on.

That's most of what communication is. Adapting to what works best for the person you're communicating with, rather than what's most natural for you to say. Leaders can act on a decision list. Nobody can act on a context dump.

So I brought two things.

A boundaries document. Not aspirations. What we do, what we shouldn't be doing but are doing anyway, and what we don't do at all. The middle ground, what we do but shouldn't, is the one that needs the focus. For foundational work this matters double, because when a customer incident lands it arrives as a login error or a hang after sign-in, and most of the time it has nothing to do with us. Without that written down, we get pulled into every one of them.

The roadmap, and where we actually are against it. Nothing gives new leadership a clearer picture of what they've just taken on, and the picture is what an action plan comes out of. Where the work is going, what's already committed and to whom, what's burning, and what's going well.

And the one that matters most: I asked what they expected of us, and mapped our work to it out loud. Not on day one. They need room to breathe first, and asking too early is dumping, not enabling. Enabling a new leader isn't a performance. It's showing them, repeatedly, that their problems get smaller when they route them through you.

The team with questions

The questions start almost immediately. "Should I update my resume?" "What's our domain now?" "What are we doing, and what are we not doing anymore?"

These are valid questions and they carry real concern. It's what people do when the shape of things changes and the details haven't caught up yet. I've asked the same questions myself.

The tempting move is reassurance. "Nothing will change, don't worry." I've watched managers say that. The words are cheap, everyone knows they're cheap, and when something does change, you've spent credibility you can't buy back.

Here's what I did instead.

I answered the resume question directly. My actual answer: "Your resume should always be current, and it's got nothing to do with this. What I can tell you is what I know, what I don't, and where to put your attention, which is one part you can control." And the standing promise underneath it: the moment I know something relevant, and I'm allowed to pass it on, they hear it from me.

Straight answers aren't comfort, and they aren't meant to be. What that does is point everyone back at the actual work, which is adapting alongside an organization that's adapting around us.

I separated what changed from what didn't, in writing. Reporting lines changed. The on-call rotation didn't. The systems we own didn't. The roadmap mostly didn't. Uncertainty expands to fill undefined space, and a written list shrinks the space. I kept a running FAQ, including the questions I couldn't answer yet, with "I don't know, here's when I expect to" beside them. My guarantee has always been that my engineers know what I know. Saying I don't know, and then going to find out, is part of keeping it.

And I gave that "where do we fit" question the real answer rather than a pep talk, the same one I gave him in the 1:1. Then the team got the same boundaries document I had given leadership, so nobody was working from a different version of what we owned.

Then I socialized it upward until it stuck. The bar I set was that anyone in the company, asked about us, could say in sixty seconds what we do and what we don't. That's the test, and it isn't met until you're out of the room.

Did the uncertainty vanish overnight? No. Calm came first. Acceptance came after it, and nobody announced it. Once I had a concrete answer the questions stopped, and the people who had asked them didn't come back a week later with the same question in different words. That is the signal, and it's most of what you get.

And the questions changed shape. "What happens to us?" became "should we be picking up more of this now?" That's the same energy pointed somewhere useful, and it's the part I'd most want another platform manager to hear.

A reorganization is one of the better opportunities a foundational team ever gets.

The people who arrive

A reorganization rarely just moves you. Sometimes you lose people and sometimes you gain them, and losing them is by far the hardest part of this job. It isn't what this post is about. The ones who arrived came carrying their own version of the same questions, plus one more: nobody on either side had picked this, and everybody knew it.

So the first thing I did was make them part of the team rather than guests in it. They came in carrying work, so they finished it first. As each one landed, I paired them with the engineers who had been here longest and brought them into everything we ran.

The design documents, and a seat in the design meetings. Nobody sensible expects a new engineer to be in the code on day one, and for the senior people that would be the wrong use of them anyway. Design reviews are where a team's reasoning is visible, and they're the first place where experience and feedback can change things.

Nobody announces the moment it lands, but you can see it. The first change they ship into your production, a config fix or a small feature off the critical path, changes how someone sits in a meeting. They stop being someone who was moved here and start being someone who works here.

And I gave them the same account of the reorganization I had given the existing team, in the same words. If you want one team rather than two groups wearing the same badge, everybody has to be working from the same understanding of why they're sitting together.

What I'd tell myself before the next one

There will be a next one. That's not cynicism, just base rates, and now I know why.

The team takes its cues from you, and they read you better than you think. Not from your announcements. From your posture in meetings, and whether your 1:1 questions sound like curiosity or like an exit interview.

So I didn't try to project anything. I reasoned it out, and the reasoning is what steadied me. In identity a reorganization is closer to a blessing than a threat, because whatever the chart looks like afterward, somebody still has to own the login box. Once that was clear to me I didn't have to work at the posture. I just had to say it out loud, as often as it took.

Being table stakes is a particular seat. The bar only ever goes up, the wins are quiet, and the chart will keep getting redrawn around you. None of that determines whether your team thrives.

What to take from this

What you do next, does!

Start by naming it correctly, and keep naming it. Not every reorganization is the same. Some are survival. Some are a company aligning itself to a reality that already changed. Your team knows which one they're in, and handled badly the two read identically, which is the whole problem. So work out which one you're actually in, and frame every answer to fit it. The aim is to calm the waters.

If it's survival, that's the easier one, and the company will do most of that work for you. If it's the second kind, nobody else is going to do it, and that's where you step in as the stabilizing force. The organization isn't confused about where you belong. It's adapting to a world that won't sit still, and structure is the fastest lever it has. That reframe only works through repetition. Not once, in the meeting where it gets announced, but every time the question surfaces, in the 1:1 and the corridor and the standup, for weeks after you think it's settled. The same answer every time is what turns it from a line you delivered into something the team believes.

Do all reorganizations fall neatly into those two categories? No. There are endless variations, and I've had my own, but those are worth a post of their own. Some are genuinely confusing, where nobody will tell you much and you're working with very little. Some are political. You know your own circumstance better than I do, and if it's one of those the advice is different. Escalate. Be truthful about what you need and about what you're seeing on the ground. Don't lay blame, describe the situation, and work towards something that's both diplomatic and logical. Say what you don't know, then go and get the answer. You're not alone.

Then work with whoever has just been handed your team, rather than around them. They're absorbing as much change as you are, from the other side and with less context, and the pull to perform for them is the wrong instinct. Shorten the distance between them and a good decision instead. The roadmap and where you actually are against it, what's burning and what's going well. Ask what they expect of you once they've had room to breathe.

And take what the new neighborhood is good at. Every part of an org is good at something. Infrastructure taught us scale and shared practice. Product put us next to the people we were building for. Find that, use it, and deliver for the people around you, because an org that counts you as one of its own is a force multiplier you can't build yourself.

Get those right and where you land on the chart matters much less.

Reorganizations will keep happening, and most of them are the organization doing its job. You don't get a vote on that. You do get to decide how well your team comes through it, and everything above is what worked for me rather than a method.

Being unsettled is a reasonable response to change and it passes on its own. The anxiety is what's left when nobody has explained the change, and that part is yours to take away.

If you've lived through your own version of this, I'd like to hear what you did differently. I'm still collecting. And if you're in the middle of one now and want to talk it through, get in touch. I can't promise answers for your situation, but I can help you work out the right frame for it.